Close Menu
Vardiafrica
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

NERC issues mini-grid regulations, mandates permits for operators of systems above 100kW

April 14, 2026

Customs Deploys AI Systems to Boost Revenue Generation, Transparency, Accountability

April 14, 2026

FIFA rejects Iran’s request to relocate World Cup games amid US-Israel war

April 14, 2026
Facebook X (Twitter) Instagram
Trending
  • NERC issues mini-grid regulations, mandates permits for operators of systems above 100kW
  • Customs Deploys AI Systems to Boost Revenue Generation, Transparency, Accountability
  • FIFA rejects Iran’s request to relocate World Cup games amid US-Israel war
  • Diezani Alison-Madueke opens defence in UK court, denies bribery allegations
  • FG removes import duties on electric vehicles, transit buses
  • ICPC: Court Adjourns El-Rufai’s Bail Hearing To April 14
  • ‘Accidental strikes’: NAF to investigate alleged civilian casualties in Borno
  • Dangote refinery eyes multi-exchange listing for $20 billion refinery across Africa 
Facebook X (Twitter) Instagram
VardiafricaVardiafrica
Demo
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance
Vardiafrica
Home»Electricity»Ongoing Road Construction: Parts of Abuja to Witness Power Outage for weeks – TCN
Electricity

Ongoing Road Construction: Parts of Abuja to Witness Power Outage for weeks – TCN

VardiafricaBy VardiafricaOctober 29, 2025Updated:October 29, 2025No Comments5 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Transmission Company of Nigeria, TCN, has announced that there will be electricity disruption lasting over two weeks in parts of Abuja.

TCN’s spokesperson, Ndidi Mbah, disclosed this in a statement on Monday.

According to the company, the outage, scheduled from Tuesday, October 27, to Sunday, November 16, is due to road construction activities in the Federal Capital Territory.

It explained that the 132-kilovolt Gwagwalada–Kukwaba–Apo double-circuit transmission line would be without power supply during the period. Consequently, bulk electricity supply will be temporarily unavailable in the Apo, Lokogoma, Guzape, Asokoro, Wuye, Utako, Jabi, and Idu Industrial Layout areas within the construction period.

“The Transmission Company of Nigeria, TCN, wishes to inform the public that there will be power outages in some parts of the Federal Capital Territory , as the Federal Capital Development Authority will commence road construction works along the Kuje axis from Tuesday, 28th October, to 16th November, 2025. The construction work will affect the 132 kV Gwagwalada-Kukwaba-Apo double-circuit transmission line.

“In view of this, TCN will undertake a planned load management operation that will involve temporary interruption of power within the working hours for the road construction to ensure the safety of all stakeholders.

“The planned outage will be executed in three phases to enhance seamless operations. The first phase is scheduled to commence from Tuesday, 28th October, to Sunday, 2nd November, 2025, between the hours of 9:00 a.m. and 5:00 pm daily. The second phase will take place from 6th November to 9th November 2025 between 9.00 am and 5.00 pm daily, while the third phase will take effect from 12th November to 16th November 2025 between 9.00 am and 3.00 pm daily.

“However, TCN assures that during this period, the following areas within the FCT, namely Apo, Lokogoma, Guzape, Asokoro, Wuye, Utako, Jabi, and Idu Industrial Layout, will experience temporary power interruption, while normal power supply will be restored to the affected areas at the end of each day’s work period,” TCN stated.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Vardiafrica
  • Website
  • Facebook
  • X (Twitter)
  • Instagram

Related Posts

NERC issues mini-grid regulations, mandates permits for operators of systems above 100kW

April 14, 2026

Presidency Clarifies ₦3.3trn Settlement Plan Approved For GenCos By Tinubu

April 9, 2026

President Tinubu Approves ₦3.3trn Payment Plan To Restore Reliable Power 

April 5, 2026

Leave A Reply Cancel Reply

Top Posts

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202495

Nigeria Takes Over G-24 Leadership, Pledges Push For Global Economic Reforms

October 15, 202564

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202549

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202443
Don't Miss
Electricity
Electricity By VardiafricaApril 14, 20261 Min Read1

NERC issues mini-grid regulations, mandates permits for operators of systems above 100kW

By VardiafricaApril 14, 20261 Electricity Updated:April 14, 202601 Min Read

The Nigerian Electricity Regulatory Commission (NERC) has issued the Mini-Grid Regulations 2026. This regulatory document,…

Customs Deploys AI Systems to Boost Revenue Generation, Transparency, Accountability

April 14, 2026

FIFA rejects Iran’s request to relocate World Cup games amid US-Israel war

April 14, 2026

Diezani Alison-Madueke opens defence in UK court, denies bribery allegations

April 14, 2026
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest creative news from SmartMag about art & design.

About Us
About Us

Your source for the verified news.

Email Us: info@vardiafrica.com
Contact: +234 905 338 5856

Facebook X (Twitter) Instagram YouTube WhatsApp
Our Picks

NERC issues mini-grid regulations, mandates permits for operators of systems above 100kW

April 14, 2026

Customs Deploys AI Systems to Boost Revenue Generation, Transparency, Accountability

April 14, 2026

FIFA rejects Iran’s request to relocate World Cup games amid US-Israel war

April 14, 2026
Most Popular

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202495

Nigeria Takes Over G-24 Leadership, Pledges Push For Global Economic Reforms

October 15, 202564

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202549

Type above and press Enter to search. Press Esc to cancel.