Close Menu
Vardiafrica
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

NCDMB Hosts 5th Edition of Book Reading Programme, Tasks Nigerians on Culture of Learning

September 17, 2026

FG suspends take-off of King’s College concession for two weeks

September 17, 2026

‘Inaccurate’, Air Peace Tackles NCAA Over Flight Delay Report

September 17, 2026
Facebook X (Twitter) Instagram
Trending
  • NCDMB Hosts 5th Edition of Book Reading Programme, Tasks Nigerians on Culture of Learning
  • FG suspends take-off of King’s College concession for two weeks
  • ‘Inaccurate’, Air Peace Tackles NCAA Over Flight Delay Report
  • World’s water cycle becoming more unpredictable, UN warns
  • Todd Boehly steps down as Chelsea chairman after selling ownership stake
  • NLC demands emergency palliatives, wage awards as petrol Price Surges
  • NAF receives five New Helicopters to boost Air Operations against terrorists, bandits
  • FG Distributes Over 200,000 Maternal Kits, Targets 2.9m Pregnant Women, Families By 2028
Facebook X (Twitter) Instagram
VardiafricaVardiafrica
Demo
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance
Vardiafrica
Home»Electricity»National Grid: FG Threatens To Cut Off GenCos Over Violations
Electricity

National Grid: FG Threatens To Cut Off GenCos Over Violations

VardiafricaBy VardiafricaSeptember 1, 2025Updated:September 1, 2025No Comments4 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Federal Government has threatened to disconnect power-generating companies (GenCos) from the national grid if they fail to activate Free Governor Control (FGC) across all generating units, in a move aimed at curbing repeated system collapses and ensuring grid stability.

The Nigerian Electricity Regulatory Commission (NERC) issued the warning in Order NERC/2025/094, signed on August 26 by Vice-Chairman Musiliu Oseni and Commissioner for Legal, Licensing & Compliance, Dafe Akpeneye. The directive, which takes effect on September 1, 2025, mandates GenCos to comply with FGC requirements or face sanctions.

FGC is a turbine governor control system that allows power plants to automatically adjust their output in response to changes in grid frequency. By stabilising the grid, the system ensures demand and supply remain balanced, preventing widespread outages.

Under the new rules, any GenCo that fails to implement FGC on its generating units by November 30, 2025, will be fined 10 per cent of the invoice associated with the defaulting unit for every day of non-compliance. A generating unit that remains in breach for 90 consecutive days will be disconnected from the grid until certified compliant by the Nigerian Independent System Operator (NISO).

NERC said the measures were introduced after the national grid suffered eight disturbances in 2024, including five full system collapses and three partial outages. Investigations by the Transmission Company of Nigeria linked the incidents to widespread non-compliance with FGC requirements among GenCos.

To enforce compliance, the regulator has directed all grid-connected power plants to install fast-acting governor systems and operate them in real time. GenCos are also required to procure Grade Level 5 IoT-enabled meters capable of monitoring active power, reactive power, voltage, frequency, and power factor. These must be installed by October 31, 2025, after which NISO will integrate them within 20 days.

NISO will track compliance using real-time data, compile hourly performance records, and submit monthly reports to NERC. Defaulting operators will have penalties applied directly through the market settlement process, with proceeds remitted into the Ancillary Service Account.

The commission stressed that its authority is rooted in the Electricity Act 2023, which empowers it to set and enforce operating codes that guarantee safety, security, and reliability in the electricity sector.

NERC also reminded GenCos that the Grid Code requires every generating unit to be fitted with fast-acting governors capable of primary control. “Where a generating unit becomes isolated from the system but is still available to supply demand, it must be able to provide primary control to maintain frequency and voltage,” the order stated.

The commission added that failure to enforce FGC compliance would continue to expose Nigeria’s fragile power sector to instability, with devastating consequences for consumers and the economy

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Vardiafrica
  • Website
  • Facebook
  • X (Twitter)
  • Instagram

Related Posts

FG to end electricity subsidy from 2027

July 31, 2026

President Tinubu Assures Better Electricity, Launches Youth Metering Programme

July 24, 2026

FG to Issue Fresh N729bn Bond to Clear Verified GenCos Debts

July 21, 2026

Leave A Reply Cancel Reply

Top Posts

Nigeria Takes Over G-24 Leadership, Pledges Push For Global Economic Reforms

October 15, 2025576

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202498

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202454

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202552
Don't Miss
Oil & Gas
Oil & Gas By VardiafricaSeptember 17, 20264 Mins Read2

NCDMB Hosts 5th Edition of Book Reading Programme, Tasks Nigerians on Culture of Learning

By VardiafricaSeptember 17, 20262 Oil & Gas Updated:September 17, 202604 Mins Read

It was a celebration of literary culture and journalistic excellence at the Conference Centre of…

FG suspends take-off of King’s College concession for two weeks

September 17, 2026

‘Inaccurate’, Air Peace Tackles NCAA Over Flight Delay Report

September 17, 2026

World’s water cycle becoming more unpredictable, UN warns

September 17, 2026
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest creative news from SmartMag about art & design.

About Us
About Us

Your source for the verified news.

Email Us: [email protected]
Contact: +234 905 338 5856

Facebook X (Twitter) Instagram YouTube WhatsApp
Our Picks

NCDMB Hosts 5th Edition of Book Reading Programme, Tasks Nigerians on Culture of Learning

September 17, 2026

FG suspends take-off of King’s College concession for two weeks

September 17, 2026

‘Inaccurate’, Air Peace Tackles NCAA Over Flight Delay Report

September 17, 2026
Most Popular

Nigeria Takes Over G-24 Leadership, Pledges Push For Global Economic Reforms

October 15, 2025576

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202498

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202454

Type above and press Enter to search. Press Esc to cancel.