Close Menu
Vardiafrica
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Dangote rolls out Nigeria’s first locally assembled electric truck

November 16, 2026

2027: INEC Begins BVAS Configuration, Airlifts Election Materials To States

November 16, 2026

Ugandan Govt Woos Dangote To Invest In Nation’s Oil Refining, Fertiliser, Salt Production Sectors

November 16, 2026
Facebook X (Twitter) Instagram
Trending
  • Dangote rolls out Nigeria’s first locally assembled electric truck
  • 2027: INEC Begins BVAS Configuration, Airlifts Election Materials To States
  • Ugandan Govt Woos Dangote To Invest In Nation’s Oil Refining, Fertiliser, Salt Production Sectors
  • NNPC Secures $1.5bn Financing For AKK Pipeline, Targets Abuja Gas Supply By Year-End
  • Fast-track Reconstruction of Sapele-Benin Expressway, Minister Charges NDDC
  • JAMB to introduce pre-registration app to guide UTME candidates on course, institution choices
  • Customs To Deploy AI, Advanced Scanners To Detect Smuggling, Curb Corruption
  • INEC begins movement of non sensitive election materials to states ahead of 2027 polls
Facebook X (Twitter) Instagram
VardiafricaVardiafrica
Demo
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance
Vardiafrica
Home»Oil & Gas»Fast-track Reconstruction of Sapele-Benin Expressway, Minister Charges NDDC
Oil & Gas

Fast-track Reconstruction of Sapele-Benin Expressway, Minister Charges NDDC

VardiafricaBy VardiafricaNovember 16, 2026Updated:November 16, 2026No Comments3 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Minister of Regional Development, Engr. Abubakar Momoh, has charged the Niger Delta Development Commission, NDDC, to fast-track the reconstruction of the Sapele-Benin Expressway, linking Edo and Delta States.

Momoh, who inspected the ongoing reconstruction of the damaged sections of the road in the company of the NDDC Executive Director, Projects, Dr Victor Antai, expressed concern over the deplorable state of the road and urged the construction firm to quicken the pace of work to restore the road and ensure the safety of commuters and other road users.

The Minister commended the NDDC for reconstructing the 15.4-kilometre failed sections of the Benin-Sapele Expressway, describing it as a major intervention that would ease movement and boost economic activities in Edo and Delta States.

He assured that the observations made during the inspection would receive the necessary attention, adding that relevant agencies and contractors would be encouraged to take appropriate measures to address the identified defects.

Momoh reiterated the Federal Government’s commitment under President Bola Ahmed Tinubu’s Renewed Hope Agenda to provide durable road infrastructure to improve transportation and support economic activities in the states along the East-West Road corridor.

The NDDC Executive Director, Projects, Dr Victor Antai, said the reconstruction would cover approximately 15.4 kilometres and assured that work on the failed sections of the road would be accelerated.

He thanked President Tinubu for his commitment to developing the Niger Delta region, noting that the NDDC Board and management, led by Chairman Mr Chiedu Ebie and Managing Director Dr Samuel Ogbuku, would deliver on the Commission’s mandate.

Antai said the Commission was committed to fully restoring the road. He noted: “In the past two months, the road was impassable; trucks were falling over, causing lots of gridlock, but with the intervention of NDDC, none of that is happening again.”

He said further, “The damaged sections of the road under repair by NDDC covers15.4 kilometres, but we are taking the repairs in stages because the road is a major artery in the South-South region. Therefore, we can’t shut down the entire stretch at once.”

The construction firm’s site manager, Engr. Michel Isah, assured that work would be completed in three months if the weather was favourable. He said the work was delayed due to adverse weather conditions.

Some of the sections inspected are Ibada Elume in Warri-Sapele Local Government Area, Mosogar in Ethiope West LGA and Okwadede in Sapele LGA

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Vardiafrica
  • Website
  • Facebook
  • X (Twitter)
  • Instagram

Related Posts

NNPC Secures $1.5bn Financing For AKK Pipeline, Targets Abuja Gas Supply By Year-End

November 16, 2026

Dangote Raises Africa Investment Target To $70bn, Plans 10,000MW Power Expansion

November 13, 2026

NLNG, NCDMB commit N13 billion to research in six universities

November 11, 2026

Leave A Reply Cancel Reply

Top Posts

Nigeria Takes Over G-24 Leadership, Pledges Push For Global Economic Reforms

October 15, 2025805

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 2024100

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202454

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202553
Don't Miss
Business
Business By VardiafricaNovember 16, 20267 Mins Read1

Dangote rolls out Nigeria’s first locally assembled electric truck

By VardiafricaNovember 16, 20261 Business Updated:November 16, 202607 Mins Read

Dangote Sinotruk West Africa Limited has unveiled Nigeria’s first locally assembled electric heavy-duty truck, marking…

2027: INEC Begins BVAS Configuration, Airlifts Election Materials To States

November 16, 2026

Ugandan Govt Woos Dangote To Invest In Nation’s Oil Refining, Fertiliser, Salt Production Sectors

November 16, 2026

NNPC Secures $1.5bn Financing For AKK Pipeline, Targets Abuja Gas Supply By Year-End

November 16, 2026
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest creative news from SmartMag about art & design.

About Us
About Us

Your source for the verified news.

Email Us: [email protected]
Contact: +234 905 338 5856

Facebook X (Twitter) Instagram YouTube WhatsApp
Our Picks

Dangote rolls out Nigeria’s first locally assembled electric truck

November 16, 2026

2027: INEC Begins BVAS Configuration, Airlifts Election Materials To States

November 16, 2026

Ugandan Govt Woos Dangote To Invest In Nation’s Oil Refining, Fertiliser, Salt Production Sectors

November 16, 2026
Most Popular

Nigeria Takes Over G-24 Leadership, Pledges Push For Global Economic Reforms

October 15, 2025805

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 2024100

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202454

Type above and press Enter to search. Press Esc to cancel.