Close Menu
Vardiafrica
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Malami yet to meet bail requirements – EFCC

December 13, 2025

Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency

December 13, 2025

Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration

December 13, 2025
Facebook X (Twitter) Instagram
Trending
  • Malami yet to meet bail requirements – EFCC
  • Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency
  • Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration
  • CBN gives PoS terminal providers one month to connect system to NIBSS, UPSL
  • Turaki, Other PDP Elder Statesmen Meet With Obasanjo In Abeokuta
  • Tinubu hails Wike as ‘Shining Star,’ exceptional performer in cabinet on 58th birthday
  • No Christian Or Muslim Genocide In Nigeria, President Tinubu Insists
  • NEMA Sets Up Emergency Response Lines For Festive season
Facebook X (Twitter) Instagram
VardiafricaVardiafrica
Demo
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance
Vardiafrica
Home»Politics»Africa»Ghana Begins Construction of $12 Billion Oil Refinery
Africa

Ghana Begins Construction of $12 Billion Oil Refinery

VardiafricaBy VardiafricaAugust 21, 2024Updated:August 21, 2024No Comments7 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Ghana has officially commenced the construction of a state-of-the-art oil refinery with a capacity of 300,000 barrels per day (bpd), aiming to establish itself as the petroleum hub of West Africa. The announcement was made by Ghanaian President Nana Akufo-Addo on Monday, August 19, 2024.

Since becoming an oil producer in 2010, Ghana, the world’s second-largest cocoa producer, has steadily increased its oil output, which currently stands at approximately 132,000 bpd of crude oil and 325 million standard cubic feet per day of natural gas.

“This project promises to be a cornerstone of our nation’s development,” President Akufo-Addo stated during a ceremony at the project site in Jomoro, a southwestern city. In addition to the refinery, the site will also house petrochemical plants, further boosting the country’s industrial capabilities.

The first phase of this ambitious project, which carries a price tag of $12 billion, will be financed and constructed by a consortium comprising Touchstone Capital Group Holdings, UIC Energy Ghana, China Wuhan Engineering Company, and China Construction Third Engineering Bureau Company, according to the president.

West Africa currently consumes about 800,000 bpd, nearly 90% of which is imported, according to the African Refiners and Distributors Association. The new refinery is intended to supply sufficient refined products and by-products to meet the region’s needs by 2036, as outlined in an agreement signed in June 2018.

However, the project has met with skepticism and opposition. Bright Simons, Vice President at the Accra-based think tank IMANI Africa, expressed doubts about the consortium’s capacity to deliver. “The consortium behind the project is not primed for investment, and the project lacks a bankable business plan,” Simons said. “Our position is that this is a speculative attempt to grab a landbank for cheap.”

In addition, some residents of the proposed 20,000-acre project site have protested, demanding that the refinery’s footprint be reduced to 5,000 acres. Oliver Barker-Vormawor, a senior partner at a law firm representing affected farmer cooperatives, stated that his clients remain firm in their opposition. “The abrasive manner in which the government is proceeding discounts valid concerns around the social and environmental impact of the project, the livelihoods at risk due to the displacement of farmers, and the unresolved questions of ownership and community land rights,” Barker-Vormawor emphasized.

The government, however, has dismissed these concerns, pointing to petitions from other residents who support the project

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Vardiafrica
  • Website
  • Facebook
  • X (Twitter)
  • Instagram

Related Posts

Dangote refinery reduces ex-depot petrol price from N828/litre to N699/litre

December 12, 2025

NCDMB, Media Team Visit Marconi.NG, As Firm Assures on Cost, Schedule Competitiveness

December 12, 2025

Retool Universities to Solve Problems, Ogbuku Advocates

December 12, 2025

Leave A Reply Cancel Reply

Top Posts

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202493

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202549

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202442

FG Reportedly Lists 15 Persons, BDCs As Terrorism Financiers

March 20, 202430
Don't Miss
Trending
Trending By VardiafricaDecember 13, 20253 Mins Read3

Malami yet to meet bail requirements – EFCC

By VardiafricaDecember 13, 20253 Trending Updated:December 13, 202503 Mins Read

The Economic and Financial Crimes Commission (EFCC) says Abubakar Malami, former attorney-general of the federation,…

Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency

December 13, 2025

Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration

December 13, 2025

CBN gives PoS terminal providers one month to connect system to NIBSS, UPSL

December 13, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest creative news from SmartMag about art & design.

About Us
About Us

Your source for the verified news.

Email Us: info@vardiafrica.com
Contact: +234 905 338 5856

Facebook X (Twitter) Instagram YouTube WhatsApp
Our Picks

Malami yet to meet bail requirements – EFCC

December 13, 2025

Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency

December 13, 2025

Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration

December 13, 2025
Most Popular

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202493

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202549

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202442

Type above and press Enter to search. Press Esc to cancel.