Close Menu
Vardiafrica
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Malami yet to meet bail requirements – EFCC

December 13, 2025

Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency

December 13, 2025

Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration

December 13, 2025
Facebook X (Twitter) Instagram
Trending
  • Malami yet to meet bail requirements – EFCC
  • Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency
  • Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration
  • CBN gives PoS terminal providers one month to connect system to NIBSS, UPSL
  • Turaki, Other PDP Elder Statesmen Meet With Obasanjo In Abeokuta
  • Tinubu hails Wike as ‘Shining Star,’ exceptional performer in cabinet on 58th birthday
  • No Christian Or Muslim Genocide In Nigeria, President Tinubu Insists
  • NEMA Sets Up Emergency Response Lines For Festive season
Facebook X (Twitter) Instagram
VardiafricaVardiafrica
Demo
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance
Vardiafrica
Home»Uncategorized»Ajaokuta-Kaduna-Kano Gas Pipeline to be completed by Q1 2025 — Mele Kyari
Uncategorized

Ajaokuta-Kaduna-Kano Gas Pipeline to be completed by Q1 2025 — Mele Kyari

VardiafricaBy VardiafricaJune 23, 2024Updated:June 23, 2024No Comments6 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Nigerian National Petroleum Company (NNPC) Limited says it will deliver the Obiafu-Obrikom-Oben (OB3) gas pipeline project by August 2024 — a shift from the previous date announced.

Mele Kyari, group chief executive officer of NNPC, spoke on Saturday during an inspection tour of the OB3 pipeline River Niger crossing operation in Delta, according to a statement by Olufemi Soneye, the firm’s chief corporate communications officer.

Speaking after the tour, Kyari expressed delight at the breakthrough, which signals the imminent completion of the project.

“This is a major project of monumental value to our country. What this means is that this is the only way we can deliver the gas revolution,” Kyari said.

“I am very happy and convinced that, by the middle of August, we will complete this project. I have been assured of that by the project team.

“Once completed, we will see about 2.2 billion standard cubic feet of gas coming into our network.

“We believe that this will give our country a breathing space of demand, I am sure we can catch up with that kind of demand in the next one and half years.

“We are happy that this will give us the platform to unleash the gas revolution in our country.”

Also speaking on the project, Ekperikpe Ekpo, minister of state for petroleum resources (gas), expressed satisfaction with the pace of work at the OB3 River Niger Crossing operation, describing it as “Renewed Hope at work”.

“I was here last year, and I saw the work that was going on. There was a promise that it would be completed by December last year,” Ekpo said.

“I took it with a doubt. But today, from what I can see, I am confident that by July or August it will be completed, and it will be commissioned by the President.”

On her part, Olu Verheijen, special adviser to the president on energy, said she was looking forward to the completion of the project, having been assured by the technical team that the right technology has been found to resolve the complex challenges of the River Niger Crossing.

According to the statement, the OB3 gas pipeline is the interconnector which links the eastern gas pipeline network to the Escravos-Lagos pipeline system (ELPS) in the west and the Ajaokuta-Kaduna-Kano (AKK) pipeline in the north.

The national oil firm said the River Niger crossing operation had been the major impediment to the completion of the strategic OB3 gas pipeline for over three years due to the failure of the various technologies deployed to achieve the construction of the 48-inch pipe under the riverbed between Ndoni in Rivers state and Aboh in Delta

With the adoption of the micro-tunnelling and direct pipe installation technology, the NNPC said the new contractors, Messrs. HDD Thailand/Enikkom and Tunnelling Services Group (TSG), are making headway with about 860 meters out of the 1,800 meters achieved so far

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Vardiafrica
  • Website
  • Facebook
  • X (Twitter)
  • Instagram

Related Posts

Rivers assembly accuses Fubara of unapproved spending, awarding contracts to cronies

December 12, 2025

Tinubu meets Osun APC Governorship aspirants, harps on party unity, consensus building

December 11, 2025

Senate confirms ex-CDS Musa as Defence Minister

December 3, 2025

Leave A Reply Cancel Reply

Top Posts

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202493

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202549

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202442

FG Reportedly Lists 15 Persons, BDCs As Terrorism Financiers

March 20, 202430
Don't Miss
Trending
Trending By VardiafricaDecember 13, 20253 Mins Read3

Malami yet to meet bail requirements – EFCC

By VardiafricaDecember 13, 20253 Trending Updated:December 13, 202503 Mins Read

The Economic and Financial Crimes Commission (EFCC) says Abubakar Malami, former attorney-general of the federation,…

Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency

December 13, 2025

Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration

December 13, 2025

CBN gives PoS terminal providers one month to connect system to NIBSS, UPSL

December 13, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest creative news from SmartMag about art & design.

About Us
About Us

Your source for the verified news.

Email Us: info@vardiafrica.com
Contact: +234 905 338 5856

Facebook X (Twitter) Instagram YouTube WhatsApp
Our Picks

Malami yet to meet bail requirements – EFCC

December 13, 2025

Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency

December 13, 2025

Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration

December 13, 2025
Most Popular

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202493

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202549

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202442

Type above and press Enter to search. Press Esc to cancel.