Close Menu
Vardiafrica
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Malami yet to meet bail requirements – EFCC

December 13, 2025

Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency

December 13, 2025

Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration

December 13, 2025
Facebook X (Twitter) Instagram
Trending
  • Malami yet to meet bail requirements – EFCC
  • Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency
  • Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration
  • CBN gives PoS terminal providers one month to connect system to NIBSS, UPSL
  • Turaki, Other PDP Elder Statesmen Meet With Obasanjo In Abeokuta
  • Tinubu hails Wike as ‘Shining Star,’ exceptional performer in cabinet on 58th birthday
  • No Christian Or Muslim Genocide In Nigeria, President Tinubu Insists
  • NEMA Sets Up Emergency Response Lines For Festive season
Facebook X (Twitter) Instagram
VardiafricaVardiafrica
Demo
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance
Vardiafrica
Home»Government»Senate Summons Julius Berger MD Over Odukpani-Itu Highway Project Delay
Government

Senate Summons Julius Berger MD Over Odukpani-Itu Highway Project Delay

VardiafricaBy VardiafricaDecember 12, 2024Updated:December 12, 2024No Comments7 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Senate has summoned the Managing Director of Julius Berger Nigeria PLC, Peer Lubasch, over the company’s refusal to honour invitations to provide details on the Odukpani-Itu Highway project.

The Odukpani-Itu Highway is located in Cross River State and Akwa Ibom states. It connects the town of Odukpani in Cross River State to Itu in Akwa Ibom State, serving as a critical link for transportation and economic activities in the South-South region.

According to a motion sponsored by Senator Osita Ngwu, Julius Berger has neglected and refused to honour invitations to provide details of their role in the project, despite receiving substantial public funds amounting to over ₦18 billion.

The Senate has condemned the refusal of Julius Berger and other entities to honour lawful invitations, which constitutes contempt of the National Assembly and undermines constitutional authority.

Furthermore, the Senate has invoked its constitutional powers to issue a warrant of arrest to compel the attendance of the Managing Director of Julius Berger at the rescheduled investigative hearing.

The upper chamber also agreed to a motion seeking an investigation into the recent demolitions in the Federal Capital Territory (FCT) and has set up an investigative committee to look into the matter.

The committee will also invite the FCT Minister, Nyesom Wike, to appear before it to explain the reasons behind the demolitions, which have left many residents without homes.

The motion, which was moved by Senator Ireti Kingibe of the FCT Senatorial District, expressed concern over the illegal demolition of structures in the nation’s capital and called for an immediate stop to further demolitions.

The Senate resolved to set up an investigative committee to look into the demolitions and report back to it within a specified timeframe

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Vardiafrica
  • Website
  • Facebook
  • X (Twitter)
  • Instagram

Related Posts

Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency

December 13, 2025

Tinubu hails Wike as ‘Shining Star,’ exceptional performer in cabinet on 58th birthday

December 13, 2025

No Christian Or Muslim Genocide In Nigeria, President Tinubu Insists

December 13, 2025

Leave A Reply Cancel Reply

Top Posts

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202493

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202549

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202442

FG Reportedly Lists 15 Persons, BDCs As Terrorism Financiers

March 20, 202430
Don't Miss
Trending
Trending By VardiafricaDecember 13, 20253 Mins Read3

Malami yet to meet bail requirements – EFCC

By VardiafricaDecember 13, 20253 Trending Updated:December 13, 202503 Mins Read

The Economic and Financial Crimes Commission (EFCC) says Abubakar Malami, former attorney-general of the federation,…

Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency

December 13, 2025

Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration

December 13, 2025

CBN gives PoS terminal providers one month to connect system to NIBSS, UPSL

December 13, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest creative news from SmartMag about art & design.

About Us
About Us

Your source for the verified news.

Email Us: info@vardiafrica.com
Contact: +234 905 338 5856

Facebook X (Twitter) Instagram YouTube WhatsApp
Our Picks

Malami yet to meet bail requirements – EFCC

December 13, 2025

Taiwo Oyedele: Banks to report accounts with N25m quarterly turnover to tax agency

December 13, 2025

Tinubu Absent As Obasanjo Makes First Aso Rock Trip Since His Inauguration

December 13, 2025
Most Popular

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202493

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202549

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202442

Type above and press Enter to search. Press Esc to cancel.