Close Menu
Vardiafrica
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

38 Young Nigerians Begin Drilling Engineering Field-Readiness Programme

September 7, 2026

ECOWAS trade scheme unlocks regional markets for Nigerian exporters

September 7, 2026

FCCPC Probes Uber’s Exit From Nigeria Over Unfulfilled Customers Services

September 7, 2026
Facebook X (Twitter) Instagram
Trending
  • 38 Young Nigerians Begin Drilling Engineering Field-Readiness Programme
  • ECOWAS trade scheme unlocks regional markets for Nigerian exporters
  • FCCPC Probes Uber’s Exit From Nigeria Over Unfulfilled Customers Services
  • Gov Uba Sani visit Dangote Peugeot Automobile, unveils the new 2026 Peugeot 3008 and 5008 models
  • Uber launches AI powered robotaxis in London
  • NCDMB champions African Local Content, industrial growth at Africa Oil Week 2026
  • FG Unveils Nigeria First National Land Transport Policy
  • Nigeria, IEA Sign Agreement To Strengthen Energy Sector
Facebook X (Twitter) Instagram
VardiafricaVardiafrica
Demo
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance
Vardiafrica
Home»Telecommunications»Internet Disruption: Submarine Cable Repair May Take Weeks, Says MainOne 
Telecommunications

Internet Disruption: Submarine Cable Repair May Take Weeks, Says MainOne 

VardiafricaBy VardiafricaMarch 16, 2024Updated:March 16, 2024No Comments20 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Submarine cable company, MainOne says it may take up to two weeks to repair undersea cable cut which disrupted internet services in Nigeria, Ghana, Cote D’Ivoire, Senegal, and other West African and East African countries since Thursday.

The company said the cause of the network outage was as a result to a fault on the MainOne network.

“Preliminary findings and further investigations revealed that the fault occurred due to an external incident that resulted in a cut on our submarine cable system, in the Atlantic Ocean offshore Cote D’Ivoire, along the coast of West Africa,” the firm stated.

Since Thursday, telecommunications subscribers and bank users have been stranded as the disruption paralysed digital transactions and internet communications. Mobile network operators like MTN and some banks have attributed the network outage on a subsea cable cut in the Atlantic Ocean.

On how long the outage would last, MainOne said, “We have a maintenance agreement with Atlantic Cable Maintenance and Repair Agreement (ACMA) to provide repair services for the submarine cable.

“First identify and assign a vessel, the vessel has to retrieve the necessary spares required for repair, and then sail to the fault location to conduct the repair work. Next, in order to complete the repair, the affected section of the submarine cable will have to be pulled from the seabed onto the ship where it will be spliced by skilled technicians.

“Post repair, joints will be inspected and tested for any defects and then the submarine cable is lowered back to the seabed and guided to a good position. This process might take 1-2 weeks for repairs while about 2-3 weeks of transit time may be required for the vessel to pick up the spares and travel from Europe to West Africa once the vessel is mobilised.”

On the possible cause of the outage in the sea, the company said, “Most submarine cable faults occur as a result of human activities such as fishing and anchoring in shallow waters near shore, natural hazards such as earthquakes, landslides, and then equipment failure.

“Given the distance from land, and the cable depth of about 3 kms at the point of fault, any kind of human activity – ship anchors, fishing, drilling etc has been immediately ruled out. Our preliminary analysis would suggest some form of seismic activity on the seabed resulted in a break to the cable, but we will obtain more data when the cable is retrieved during the repair exercise.”

In an update, the company said actions have been taken to mobilise a vessel to expeditiously repair the cable in the deep ocean.

MainOne said restoration capacity for temporary relief would be made available for customers. “While we do have some pre-configured restoration capacity on other cable systems, unfortunately, those cable systems are also down currently. We have since acquired capacity on available cable systems, but we have not found readily available capacity to fully restore services to all our customers.”

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Vardiafrica
  • Website
  • Facebook
  • X (Twitter)
  • Instagram

Related Posts

Meta to pay up $18 billion to settle children’s social media harm case, impose two-hour daily limit and block teen app usage at night

August 27, 2026

Airtel and Elon Musk’s Starlink launch Africa’s first satellite-to-phone service in DRC

August 16, 2026

FG targets broadband expansion with 90000km fibre optic rollout

August 5, 2026

Leave A Reply Cancel Reply

Top Posts

Nigeria Takes Over G-24 Leadership, Pledges Push For Global Economic Reforms

October 15, 2025533

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202498

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202454

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202552
Don't Miss
Oil & Gas
Oil & Gas By VardiafricaSeptember 7, 20263 Mins Read1

38 Young Nigerians Begin Drilling Engineering Field-Readiness Programme

By VardiafricaSeptember 7, 20261 Oil & Gas Updated:September 7, 202603 Mins Read

Thirty-eight young graduates of engineering and geosciences on Friday in Port Harcourt completed kick-off formalities…

ECOWAS trade scheme unlocks regional markets for Nigerian exporters

September 7, 2026

FCCPC Probes Uber’s Exit From Nigeria Over Unfulfilled Customers Services

September 7, 2026

Gov Uba Sani visit Dangote Peugeot Automobile, unveils the new 2026 Peugeot 3008 and 5008 models

September 7, 2026
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest creative news from SmartMag about art & design.

About Us
About Us

Your source for the verified news.

Email Us: [email protected]
Contact: +234 905 338 5856

Facebook X (Twitter) Instagram YouTube WhatsApp
Our Picks

38 Young Nigerians Begin Drilling Engineering Field-Readiness Programme

September 7, 2026

ECOWAS trade scheme unlocks regional markets for Nigerian exporters

September 7, 2026

FCCPC Probes Uber’s Exit From Nigeria Over Unfulfilled Customers Services

September 7, 2026
Most Popular

Nigeria Takes Over G-24 Leadership, Pledges Push For Global Economic Reforms

October 15, 2025533

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202498

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202454

Type above and press Enter to search. Press Esc to cancel.