Close Menu
Vardiafrica
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

NCAA Directs Air Peace To Compensate Passengers Over Delayed Flight

September 22, 2026

No Plan To Increase Electricity Tariffs, Says FG

September 22, 2026

Nigeria Launches $300m Renewable Energy Fund To Expand Electricity Access

September 22, 2026
Facebook X (Twitter) Instagram
Trending
  • NCAA Directs Air Peace To Compensate Passengers Over Delayed Flight
  • No Plan To Increase Electricity Tariffs, Says FG
  • Nigeria Launches $300m Renewable Energy Fund To Expand Electricity Access
  • President Tinubu Extends Working Vacation by Few Days
  • Nigeria To Push For Global Institutional Reforms As Shettima Leads Delegation At 81st UNGA
  • Dangote Refinery reduces fuel price as crude oil price falls
  • NDDC Emphasises Alternative Dispute Resolution for Sustainable Development
  • President Tinubu Orders 180-Day Roadmap for Nigeria’s Digital Free Zone
Facebook X (Twitter) Instagram
VardiafricaVardiafrica
Demo
  • Home
  • Politics
    • Africa
    • Asia
    • Europe
    • US & Canada
    • World
  • Lifestyle
    • Entertainment
    • Film & Drama
    • Ent & Arts
  • Science
    • Health Science
    • Luxury
  • Finance
Vardiafrica
Home»Electricity»No Plan To Increase Electricity Tariffs, Says FG
Electricity

No Plan To Increase Electricity Tariffs, Says FG

VardiafricaBy VardiafricaSeptember 22, 2026Updated:September 22, 2026No Comments0 Views
Facebook Twitter Pinterest LinkedIn WhatsApp Reddit Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Federal Government has said it has no plan to increase electricity tariffs.

The Minister of Power, Joseph Tegbe, disclosed this on Monday at a media parley in Abuja, marking his first 100 days in office, covering June 8 to September 16.

“Let me categorically state, and this is not a political statement, we have no plan to increase electricity tariffs,” he said.

Tegbe said the government was focused on improving electricity supply and strengthening the financial and physical foundations of the power sector, rather than imposing additional costs on consumers

The minister’s statement comes amid concerns over the financial sustainability of the electricity market and the future of government support to the sector.

He said the sector was constrained across the entire value chain, with interconnected problems that could not be solved by simply adding new generation capacity.

“When President Bola Ahmed Tinubu entrusted me with the responsibility of serving as Minister of Power, I made four promises to Nigerians. I promised a disciplined approach to solving the sector’s problems. I promised to pursue grid stability through structured, strategic reforms. I promised visible incremental improvements.

“Upon assuming office, the diagnosis we undertook at the onset revealed constraints at every segment of the electricity value chain. Gas supply to power stations was limited by damaged pipelines and commercial terms that discouraged investment.

“Our generation fleet was heavily dependent on thermal plants, with ageing equipment, deferred maintenance, stalled projects and capacity unable to reach consumers. The sector diagnosis revealed payment of only 27 per cent of generation companies’ bills, undermining their ability to maintain plants and pay gas suppliers,” Tegbe stated.

The minister said transmission infrastructure was similarly under pressure from vandalised towers and lines, overstretched equipment and frequent system tripping. He added that distribution companies were recording aggregate technical, commercial and collection losses of between 30 and 40 per cent.

“Across the market, inflation and foreign exchange pressures raised costs. Arrears owed by ministries, departments and agencies exceeded 100 billion naira. Debts continued to accumulate, regulatory uncertainty weakened confidence, and inconsistent data made it difficult to establish a common factual basis for decisions.

“Substantial development-finance commitments also required better coordination to translate funding opportunities into electricity delivered,” he said.

Tegbe said the challenges reinforced one another, creating a cycle of unpaid bills, weak supply and rising debt.

“These problems reinforce one another. Unpaid bills weaken gas supply and maintenance; unreliable supply depresses collections; poor collections deepen debt. A new power station cannot, by itself, resolve that cycle.

“Sustainable improvement requires us to repair the physical system and the commercial relationships that keep it functioning,” Tegbe said.

He said the government therefore spent the first 100 days on diagnosis and stabilisation, rather than concentrating solely on new projects.

According to him, the 375MW Alaoji open-cycle power plant was restored to the national grid after three years offline, while transformers commissioned at Apapa, Ijora, Alausa and Lekki in Lagos unlocked 672MW of transmission capacity. He added that a new 300MVA transformer at Katampe, Abuja, unlocked another 240MW.

Tegbe said operational records showed generation and transmission rising above 5,000MW in the weeks preceding the media parley, compared with between 3,700MW and 4,700MW before June. Generation peaked at 5,330MW in August and September.

He, however, acknowledged that national generation figures did not necessarily reflect the experience of individual communities.

“National progress can coexist with an unreliable feeder in a particular community. So, when we say that there are improvements in certain places, we do not categorically deny the experiences of those that are yet to benefit,” he said.

On the financial side, Tegbe said the government had raised an estimated N1.23tn to address part of the N3.3tn power-sector debt backlog.

He also disclosed that about 350,000 electricity meters were installed during the first 100 days, taking cumulative installations to 1,004,260 as of August 2026. He said the resolution of litigation involving the AMMON metering programme had unlocked procurement of about 1.4 million smart meters.

On the next phase of the reforms, the minister said the government would focus on stabilising the Lagos, Enugu-Port Harcourt and Abuja-Kaduna-Kano transmission corridors, while beginning work on a Transmission Super Grid. He said technical audits had commenced along the Lagos and Abuja corridors.

He said the government would report progress over the next six months based on supply reliability, billing accuracy and the resolution of faults and complaints.

“Our original commitment to visible, incremental improvements remains the benchmark. We will report progress against that benchmark, including changes in supply reliability, billing accuracy and the resolution of faults and complaints,” he stated

Share. Facebook Twitter Pinterest LinkedIn Tumblr Telegram Email
Vardiafrica
  • Website
  • Facebook
  • X (Twitter)
  • Instagram

Related Posts

Nigeria Launches $300m Renewable Energy Fund To Expand Electricity Access

September 22, 2026

FG to end electricity subsidy from 2027

July 31, 2026

President Tinubu Assures Better Electricity, Launches Youth Metering Programme

July 24, 2026

Leave A Reply Cancel Reply

Top Posts

Nigeria Takes Over G-24 Leadership, Pledges Push For Global Economic Reforms

October 15, 2025593

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202498

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202454

Trump set for White House return, vows to sign 100 Executive Orders in ‘Hours’ 

January 20, 202552
Don't Miss
Business
Business By VardiafricaSeptember 22, 20263 Mins Read1

NCAA Directs Air Peace To Compensate Passengers Over Delayed Flight

By VardiafricaSeptember 22, 20261 Business Updated:September 22, 202603 Mins Read

The Nigerian Civil Aviation Authority, NCAA, has directed Air Peace to compensate passengers affected by…

No Plan To Increase Electricity Tariffs, Says FG

September 22, 2026

Nigeria Launches $300m Renewable Energy Fund To Expand Electricity Access

September 22, 2026

President Tinubu Extends Working Vacation by Few Days

September 22, 2026
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo

Subscribe to Updates

Get the latest creative news from SmartMag about art & design.

About Us
About Us

Your source for the verified news.

Email Us: [email protected]
Contact: +234 905 338 5856

Facebook X (Twitter) Instagram YouTube WhatsApp
Our Picks

NCAA Directs Air Peace To Compensate Passengers Over Delayed Flight

September 22, 2026

No Plan To Increase Electricity Tariffs, Says FG

September 22, 2026

Nigeria Launches $300m Renewable Energy Fund To Expand Electricity Access

September 22, 2026
Most Popular

Nigeria Takes Over G-24 Leadership, Pledges Push For Global Economic Reforms

October 15, 2025593

FG exempts SMEs, farmers, manufacturers from paying withholding tax

July 2, 202498

You rejected party structure’ – PDP knocks Fubara, says Rivers Gov, Bala Mohammed may face disciplinary action

October 15, 202454

Type above and press Enter to search. Press Esc to cancel.